Machine tool cutting construction safety technology

[Answer] 1. Construction operators must strictly abide by the laws and regulations of the state and the company's safety and labor discipline. You must wear a qualified safety helmet, fasten the caps, and lock the caps. You must not wear slippers during work activities. Chih-back (women are forbidden to wear high heels). It is forbidden to smoke on the construction site, chase slapsticks, and prohibit drink operations.

2. Before the operation of the construction operator, it is necessary to conduct a comprehensive safety inspection on the cutting machine so that the protection of the transmission part is reliable and effective, and the machine can be operated without any fault or abnormality.

3. The power line of the cutting machine must be set up at an altitude of 2 meters or more. The line must not be damaged, exposed or exposed.

The jog switch of the cutting machine shall be mounted on the operating handle and insulated;

4. The cutting machine must have a management system and personnel responsible for regular inspections, repairs and maintenance;

5. The operator must understand the performance of the cutting machine. When cutting all kinds of steel, steel and other materials, first firmly fixed the material to be cut.

During the cutting process, the force should be uniform, and stand on the side of the cutting machine to operate without frontal operation to prevent the saw blade from damaging the person.

6. The cutting wheel must be intact and firmly fixed. It is forbidden to damp, and cracks and gaps are strictly prohibited.

7. In the course of operation, if an abnormal situation occurs, the machine must be shut down immediately.

8. The cutting machine must be installed in the processing shed and must be protected from moisture. Operation in the open air is prohibited;

9. In the operation process, a protective cover should be set in front of the cutting machine to prevent sparks from causing fire hazards or injury.

10. After the cutting is completed, the gates should be opened and powered off, the gates should be locked, the waste should be cleaned up, and safe production and civilized construction should be completed.

The above content is based on the problems encountered by the students in the actual work, for reference, if you have any questions, please communicate and correct.