Main contents of on-site inspection of tailings pond

1. According to the design requirements, organize the production and operation situation, whether to prepare the annual tailings discharge operation plan according to the regulations; the rectification of hidden dangers such as illegal design, over-storage and super-capacity production that may endanger the safety of the tailings pond.

2. Whether the minimum safety and super high, minimum dry beach length, flood discharge facilities, tailing dam saturation line buried depth, dam external slope ratio, drainage facilities, etc. meet the design and requirements of the “tailing mine safety technical regulations”; Whether the top elevation meets the requirements of production, flood control, winter ice release and return water; whether the fourth or above tailings dam is equipped with dam displacement and dam body saturation line observation facilities.

3. The tailings pond that has been put into production and operation but has no formal design or incomplete information, completes the redesign or fills in the necessary information within the prescribed time limit.

4. Safety education training and certification for special operations personnel engaged in the operation of mine tailings, damming, flood discharge and drainage facilities.

5. Main measures for flood control and flood control, emergency plans, preparation of materials and equipment, etc.; effective monitoring of tailings dams; effective monitoring of residential areas or important facilities downstream of tailings dams.

6. The tailings pond used in the recovery and reuse of the tailings pond and reused after the closed warehouse has not fulfilled the rectification of the “three simultaneous” system of the construction project.

7. There are hidden dangers in the reservoir area that are involved in the safety of tailings reservoirs such as blasting or sand mining.

8. Failure to perform safety assessment, safety facility design review and completion and rectification of the completion acceptance system.

9. Safety production responsibility system, safety production rules and regulations, establishment and implementation of operational procedures, etc.

10. Accident handling and accountability, prevention of dams, flood prevention, prevention of natural disasters, etc., emergency response plans for major dangers, emergency materials reserves and drills.

11. The establishment of safety signage.

Combined Auto-loader



RAL series auto-loader uses stainless-steel hopper and high-efficient vacuum motor. It has motor overload protection device and auto-alarming device for material shortage, It is characterized with light-weight and durability, powerful suck force, easy installation and operation.
The characteristics of the equipment:
(1)Stainless steel hopper, light-weighted, durable, easy for cleaning
(2)overload protection device on motor
(3)Computer control, easy for operation.
(4)Independent filter,convenient for cleaning accumulated dust
(5)Noise-free design
(6)Auto-alarming protection device for material shortage


Introduction:
RAL-300I combined autoloader adopt single phase carbon brush motor with superior suction power and easy installation. It is particularly suitable for conveying new materials.
RAL-403I combined autoloader use a three phase induction motor with low noise and long service life. It also has an automatic motor reverse cleaning device.


Features:
Stainless steel hopper, motor overload protective device.

High-speed carbon-brush motor with small footprint and strong suction force for RAL-300I.
High-pressure induction pump with low noise and long service time for RAL-403I.

Microprocessor controller for ease of operation and has multiple alarm indicators.

Equipped with emote controller for convenient setting and operation.

Motor reversal cleaning function is available to RAL-403I.


Combined Auto-loader

Vacuum Autoloader,Automatic Loader,Auto Loader,Vacuum Loader

Ningbo Beilun Rhong Machinery Manufacturing Co., Ltd. , https://www.rhongmachinery.com